Architect: Kyu Sung Woo Architects, Inc. Project director: Joon Bahng, Kyoung Eun Kwon, Michael McKee, Stephen Lacker Project architect: Lan Ying Ip, Sanki Choi, Kyoung Eun Kwon, Irene Kang, Vital Albuquerque Architect of record: Samoo Architects & Engineers (Han Jongryul), Heerim Architects & Engineers (Jeong Youngkyoon) Location: 26-7, Munwhajeondang-ro, Dong-gu, Gwangju, Korea Program: cultural institute, library, performance halls, exhibition, children’s museum Site area: 96,036m2 Building area: 21,314m2 Gross floor area: 143,840m2 Building to land ratio: 22.19% Floor area ratio: 10.53% Building scope: B4, 4F Height: 19.3m, – 20m Parking: 594 Structure: concrete, metal panel, glass curtain wall Exterior finishing: Concrete, metal panel, glass curtain wall Structure engineer: Guy Nordenson and Associates (design), Kyungjai Structural Engineers Co., Ltd. Climate engineer: TranssolarKlima Engineering MEP: Ambrosino, DePinto & Schmieder Vantage Consulting Group (design), Samoo Mechanical Consultant,…
